Office Hours - Monday to Saturday 9 am to 7 pm.

Construction Project Scheduling and Control

Construction Project Scheduling and Control

0 customer ratings, click here to login to do the ratings.

by Saleh Mubarak
Price : LKR 2,569.72

Book Details
ISBN9788126533152
AuthorSaleh Mubarak
PublisherWiley India
Year2010
Edition2
Category Engineering

Book Description

Books Related to This Book

Construction Failure
Construction Failure

LKR 38,756.00

Construction Technology : An Illustrated Introduction
Construction Technology : An Illustrated Introduction

LKR 13,427.50

Contractual Procedures in the Construction Industry
Contractual Procedures in the Construction Industry

LKR 10,350.00

Estimating Construction Costs
Estimating Construction Costs

LKR 3,300.00

Pile Design and Construction Practice
Pile Design and Construction Practice

LKR 27,263.00

Construction Technology Vol II
Construction Technology Vol II

LKR 850.00

Construction Technology Vol 2
Construction Technology Vol 2

LKR 350.00

Practical Tunnel Construction
Practical Tunnel Construction

LKR 3,184.00

Construction Management: Principles and Practice
Construction Management: Principles and Practice

LKR 6,717.60

Engineering Construction Puzzle 45 Pieces
Engineering Construction Puzzle 45 Pieces

LKR 585.00

The Construction of Buildings Volume 1
The Construction of Buildings Volume 1

LKR 15,478.00

Fundamentals of Building Construction: Materials and Methods
Fundamentals of Building Construction: Materials and Methods

LKR 26,986.00

Construction Equipment and its Management
Construction Equipment and its Management

LKR 612.50

Modern Construction and Ground Engineering Equipment and Methods
Modern Construction and Ground Engineering Equipment and Methods

LKR 14,983.15

Building Construction 4 Hb
Building Construction 4 Hb

LKR 1,732.50